WV10-WSP-GPON (Scheduled)
  • Priority - Low
  • Affecting Other - WV10-WSP
  • We will be replacing switching cards at WV10-WSP site which is scheduled for 26th May,
    this work is required to update our GPON fibre network.

    Downtime is estimated to be 15-20 minutes per floor of the building, followed by Buildings 1-8

    Details of the times will be posted here shortly.

  • Date - 26/05/2017 00:00
  • Last Updated - 18/05/2017 08:27
WV11-11-GPON (Scheduled)
  • Priority - Low
  • Affecting Other - WV11-HH
  • We will be replacing switching cards at WV11-HH site which is scheduled for 25th May,
    this work is required to update our GPON fibre network.

    Downtime is estimated to be 15-20 minutes per floor of the building

    Details of the times will be posted here shortly.

  • Date - 25/05/2017 00:00
  • Last Updated - 18/05/2017 08:26

Server Status

Below is a real-time overview of our servers where you can check if there's any known issues.

Server Name Status Server Load Uptime
CORE
LON
POL1
POL2
STR1